Daikin E-Series Service Manual page 162

Hide thumbs Also See for E-Series:
Table of Contents

Advertisement

SiAU18-715
3.2.3
Setting of Refrigerant Additional Charging Operation
Refrigerant additional charging operation procedure
When the outdoor unit is stopped and the entire quantity of refrigerant cannot be charged from the stop valve on the liquid sid
to charge the remaining quantity of refrigerant using this procedure. If the refrigerant quantity is insufficient, the unit may malfunction.
Turn ON the power of the indoor unit and the outdoor unit.
Make sure to completely open the stop valve on the gas side and the stop valve on the liquid side.
Connect the refrigerant charge hose to the service port (for additionally charging the refrigerant).
In the stopped status, set to ON the refrigerant additional charging operation A in
set mode 2 (H1P: Turn on).
The operation is automatically started.
(The LED indicator H2P flickers, and "Test run" and "Under centralized control" are displayed in the remote controller.)
After charging the specified quantity of refrigerant, press the RETURN button (BS3) to stop the operation.
The operation is automatically stopped within 30 minutes.
If charging is not completed within 30 minutes, set and perform the refrigerant additional charging
operation A again.
If the refrigerant additional charging operation is stopped soon, the refrigerant may be overcharged.
Never charge extra refrigerant.
Disconnect the refrigerant charge hose.
Test Operation
Service port
for additionally
charging the refrigerant
Field Setting
e, make sure
149

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents