4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
8. Put the Ribbon Guide on the Print Head Block.
First insert the shaft of the Ribbon Guide on this side, then the other side into the holes of the
removed Ribbon Guide Shaft.
Insert this side first.
Ribbon Guide
Push up the Ribbon Guide so that the hooks are placed onto the right-hand Ribbon Guide Shaft.
4.10.3 Attaching the Antenna Ass'y
Assembling the Antenna Ass'y
1. Connect the Antenna Cable to the Antenna until it clicks.
Antenna Cable
Hook
Ribbon Guide Shaft
4.10 UHF RFID KIT (B-EX700-RFID-U2-US/EU/CN-R)
Connector
4-52
EO18-33027
(Revision Date: Aug. 24, 2011)
Antenna