Calibration - GE ReadyToProcess WAVE 25 Operating Instructions Manual

Bioreactor system
Table of Contents

Advertisement

6.1

Calibration

Calibration schedule
For the system to function properly, several calibrations may be performed. See tables
below.
Before each cultivation
Perform the following calibrations and adjustments before each cultivation
Calibration
Pump
DO sensor
pH sensor
When required
Perform the following calibrations when required or at least once a year.
Calibration
Scale
Temperature
CO
sors
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
Instruction
Enter tubing inner diameter in the Settings:Cellbag pumps dialog.
For perfusion cultivation, enable auto-calibration or calibrate the feed
and harvest pumps.
see Section 5.3.2 Adjust pump parameters, on page 137.
Adjust the calibration, see Section 5.3.4 Prepare the sensors, on
page 141.
Adjust the calibration, see Section 5.3.4 Prepare the sensors, on
page 141.
Repeat the calibration adjustment during cultivation if required.
Instruction
Contact GE service personnel for assistance if needed.
Note:
Scale calibration is recommended after moving the rocker, or when
the load is changed considerably. For Calibrate High point, use a
weight that is as close as possible to the load that will be applied
to the tray during use.
Contact GE service personnel for assistance if needed. Service
personnel use special equipment to achieve more accurate cali-
bration.
and O
sen-
Calibration of CO
2
2
and may impair system performance if performed incorrectly.
Contact GE service personnel for assistance.
and O
sensors requires special competence
2
2
6 Maintenance
6.1 Calibration
151

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ReadyToProcess WAVE 25 and is the answer not in the manual?

Table of Contents

Save PDF