Installation

About this chapter
This chapter provides required information to enable users and service personnel to:
Read the entire installation chapter before starting to install ReadyToProcess WAVE 25.
In this chapter
This chapter contains the following sections:
Section
4.1 Site preparation
4.2 Hardware installation
4.3 Software installation
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
unpack the bioreactor system delivered from the factory
install the system units
install UNICORN 7.0 software
edit system properties
NOTICE
The rocker contains load cells for weight measurements and should
be handled with extra care. Do not place the rocker on any parts
that may move. Avoid exposing the load cells to lateral forces, such
as pushing the unit sideways on the bench, which may cause dis-
turbances in the measurement or damage the load cells.