Start A Run - GE ReadyToProcess WAVE 25 Operating Instructions Manual

Bioreactor system
Table of Contents

Advertisement

5.2.5

Start a run

Introduction
This section describes how to start a manual or method-controlled run. Data collection
begins when the run starts.
For further information on methods, refer to ReadyToProcess WAVE 25 System Handbook.
Note:
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
Pressing the Power button on the rocker while the rocker is switched on will
shut down the system and stop any ongoing run.
5 Operation
5.2 Start and configure the system
5.2.5 Start a run
131

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents