5 Operation
5.3 Prepare for cultivation

5.3.1 Inflate the Cellbag bioreactor

5.3.1
Inflate the Cellbag bioreactor
Follow the instructions below to inflate the Cellbag bioreactor.
Step
1
2
3
4
136
Action
Make sure that all ports on the Cellbag bioreactor are closed and that inlet
and outlet filters are open.
Open Settings:Gas control:Gas flow from the Process Picture in System
Control.
Enable Fast fill. This will maximize the gas flow during the first 20 minutes.
Note:
Fast fill is disabled in the illustration below.
Turn on Gas flow from the Process Picture by pressing the right-hand side
of the Gas flow button.
Result: The Cellbag is inflated.