Settings - ABB REG650 Technical Manual

Generator protection
Hide thumbs Also See for REG650:
Table of Contents

Advertisement

1MRK 502 048-UEN A
8.2.5
Table 92:
EF4PTOC Group settings (basic)
Name
Values (Range)
Operation
EnaDir
AngleRCA
polMethod
UPolMin
IPolMin
RPol
XPol
I>Dir
2ndHarmStab
DirMode1
Characterist1
IN1>
t1
k1
IMin1
Table continues on next page
Technical manual

Settings

Unit
Off
-
On
Disable
-
Enable
-180 - 180
Deg
Voltage
-
Current
Dual
1 - 100
%UB
2 - 100
%IB
0.50 - 1000.00
ohm
0.50 - 3000.00
ohm
1 - 100
%IB
5 - 100
%
Off
-
Non-directional
Forward
Reverse
ANSI Ext. inv.
-
ANSI Very inv.
ANSI Norm. inv.
ANSI Mod. inv.
ANSI Def. Time
L.T.E. inv.
L.T.V. inv.
L.T. inv.
IEC Norm. inv.
IEC Very inv.
IEC inv.
IEC Ext. inv.
IEC S.T. inv.
IEC L.T. inv.
IEC Def. Time
Reserved
RI type
RD type
1 - 2500
%IB
0.000 - 60.000
s
0.05 - 999.00
-
1 - 10000
%IB
Step
Default
-
Off
-
Enable
1
65
-
Voltage
1
1
1
5
0.01
5.00
0.01
40.00
1
10
1
20
-
Non-directional
-
ANSI Def. Time
1
100
0.001
0.000
0.01
0.05
1
100
Section 8
Current protection
Description
Operation Off / On
Enabling the Directional calculation
Relay characteristic angle (RCA)
Type of polarization
Minimum voltage level for polarization
(UN or U2) in % of UBase
Minimum current level for polarization (IN
or I2) in % of IBase
Real part of source Z to be used for
current polarisation
Imaginary part of source Z to be used for
current polarisation
Current level (IN or I2) for direction
release in % of IBase
Second harmonic restrain operation in %
of IN amplitude
Directional mode of step 1 (off, non-
directional, forward, reverse)
Time delay curve type for step 1
Operate residual current level for step 1 in
% of IBase
Independent (definite) time delay of step 1
Time multiplier for the dependent time
delay for step 1
Minimum operate current for step1 in % of
IBase
189

Advertisement

Table of Contents
loading

Table of Contents