ABB REG650 Technical Manual page 81

Generator protection
Hide thumbs Also See for REG650:
Table of Contents

Advertisement

1MRK 502 048-UEN A
Technical manual
Activating
signal 1
Activating
signal 2
LED 1
LED 2
Automatic
reset
Manual
reset
IEC01000239 V2 EN
Figure 22:
Operating sequence 6 (LatchedReset-S), two indications within
same disturbance
Figure 23
shows the timing diagram for a new indication after tRestart time has
elapsed.
Activating
signal 1
Activating
signal 2
LED 1
LED 2
Automatic
reset
Manual
reset
IEC01000240 V2 EN
Figure 23:
Operating sequence 6 (LatchedReset-S), two different disturbances
Local Human-Machine-Interface LHMI
Disturbance
tRestart
Disturbance
tRestart
Section 5
IEC01000239_2-en.vsd
Disturbance
tRestart
IEC01000240_2_en.vsd