3 Part Names and Basic Procedures
3-4
Procedures after Turning ON the
Power Supply
3-4-1
Basic Flow of Operations
The basic flow of operations after you turn ON the power supply is shown below.
3 - 14
1. Turn ON the power supply.
↓
2. Set the input type.
↓
3. Set the control method.
↓
4. Make program-related settings.
↓
5. Set the alarm type.
↓
6. Set the programs.
↓
7. Start program operation (Run).
E5@C-T Digital Temperature Controllers User's Manual (H185)