Installing - Yamaha QT50 Service Manual

Hide thumbs Also See for QT50:
Table of Contents

Advertisement

3-5.
IN STALLIN
G
1.
Install reed valve assembly
and
mani-
fold.
2
.
Install flywheel
magneto.
3
.
Install main stand with bracket.
4
.
Install
drive axle complete.
5
.
Install
engine mounting
bolt with
proper
tightening
torque.
Tightening torque
:
50
Nm
(5.0 m-kg,
36 ft-lb)
6
.
Install
air cleaner assembly and
carbure-
tor assembly,
adjust.
7
.
Install
rear
fender and rear wheel.
Rear wheel
axle nut
torque
:
60 Nm
(6.0
m-kg.
43
ft-lb)
8
.
Install oil pump wire
and
carburetor.
9
.
Install muffler and
footrest.
Exhaust
pipe holding bolt
torque
:
10 Nm
( 1.0 m-kg,
7
ft
-lb)
3-22
3-5. MISE
EN
PLACE
I
.
Installer
!'ensemble
clapets tlexibles et
la
tubulure.
2.
Installer
le
volant magnetique.
3.
Installer la
bequille centrale avec le
s up-
port.
4
.
Installer
l'arbre de
transmission
complet.
5.
Installer
Jes
boulons de
montage
du
moteur
et !es
serrer
au couple correct.
I
Couple de
serrage:
50 Nm (5.0
m-kg)
6. Installer
!'ensemble
filtre
a
air et
!'ensem-
ble
carburateur,
regler.
7. Installer le
pare-boue
arriere
et la
roue
arriere.
Couple
de
serrage d'ecrou
d'axe
de
roue
arriere:
60
Nm
(6.0
m-kg)
8.
Installer
le cable
de la
pompe
a
huile et
le
carburateur.
9.
Installer
le
pot
d'echappement
et le repose-
pied.
Couple de serrage de
boulon
de
fixation
de tuyau d'echappement:
10
Nm
( 1,0
m-kg)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ma50

Table of Contents