Installation of VLT 5350-5500 380-500 V Compact
Nema 1 (IP 20) and IP 54
Cooling
All units in the above-mentioned series require a
minimum space of 400 mm above the enclosure
and must be installed on a plane floor. This applies
to both Nema 1 (IP 20) and IP 54 units.
Gaining access to the VLT 5350-5500 requires
a minimum space of 605 mm in front of the
frequency converter.
Filter mats in IP 54 units have to be changed regularly
depending on the operating environment.
IP 00 VLT 5350 - 5500 380 - 500 V
The IP 00 unit is designed for installation in a cabinet
when installed according to the instructions in the
18
®
VLT
5000 FLUX
Side-by-side
Compact Nema 1 (IP 20) and IP 54
All Nema 1 (IP 20) and IP 54 units in the
above-mentioned series can be installed side by
side without any space between them, since these
units do not require cooling on the sides.
VLT 5350 - 5500 Installation Guide, MG.56.AX.YY.
Please note, that the same conditions as for
Nema 1 / IP 54 must be fulfilled.