YASKAWA D1000 Series Instruction Manual page 188

Type cimr-du/power regenerative converter 200 v class, three-phase input: 5 to 130 kw/400 v class, three-phase input: 5 to 630 kw
Hide thumbs Also See for D1000 Series:
Table of Contents

Advertisement

B.2 Parameter Tables
No.
(Addr.
Name
Hex)
o3-01
Copy Function
(515H)
Selection
o3-02
Copy Allowed
(516H)
Selection
Cumulative
o4-01
Operation Time
(50BH)
Setting
Cumulative
o4-02
Operation Time
(50CH)
Selection
Cooling Fan
o4-03
Operation Time
(50EH)
Setting
o4-05
Capacitor
(51DH)
Maintenance Setting
DC Bus Pre-Charge
Relay Maintenance
o4-07
Setting DC Bus
(523H)
Pre-Charge Relay
Maintenance Setting
o4-11
U2, U3 Initialization
(510H)
o4-12
kWh Monitor
(512H)
Initialization
Number of Run
o4-13
Commands Counter
(528H)
Initialization
o4-19
Power Unit Price
(113AH)
<3> Default setting is dependent on parameter o2-09.
<7> Parameter is available in software versions PRG: 2003 and later (PRG: 3010 and later in 4A0630).
188
LCD Display
o3: Copy Function
0: No action
COPY SELECT
1: Read parameters from the converter, saving them onto
0: COPY SELECT
the digital operator.
1: INV→OP READ
2: Copy parameters from the digital operator, writing them
2: OP→INV WRITE
to the converter.
3: OP←→INV
3: Verify parameter settings on the converter to check if
VERIFY
they match the data saved on the operator.
Read Allowable
0: Read operation prohibited
0: Disabled
1: Read operation allowed
1: Enabled
o4: Maintenance Monitor Settings
Sets the value for the cumulative operation time of the
DrvElapsTimeCnt
converter in units of 10 h.
ElapsTimeCntSet
0: Logs power-on time
0: Power-On Time
1: Logs operation time when the converter output is active
1: Running Time
(output operation time).
Sets the value of the fan operation time monitor U4-03 in
FanElapsTimeCn
units of 10 h.
Sets the value of the Maintenance Monitor for the
BusCap Maint Set
capacitors. See U4-05 to check when the capacitors may
need to be replaced.
Sets the value of the Maintenance Monitor for the soft
charge bypass relay.
ChrgCircMaintSet
See U4-06 to check when the bypass relay may need to be
replaced.
0: U2-
Fault Data Init
converter is initialized (A1-03).
0: No Reset
1: U2-
1: Reset
converter is initialized (A1-03).
0: U4-10 and U4-11 monitor data is not reset when the
kWh Monitor Init
converter is initialized (A1-03).
0: No Reset
1: U4-10 and U4-11 monitor data is reset when the
1: Reset
converter is initialized (A1-03).
0: Number of Run commands counter is not reset when the
Run Counter Init
converter is initialized (A1-03).
0: No Reset
1: Number of Run commands counter is reset when the
1: Reset
converter is initialized (A1-03).
This parameter is used to calculate the power rate that is
Cost per 1 kWh
displayed for User Monitors U9-07 through U9-14.
Set the price per 1 kWh.
YASKAWA ELECTRIC TOEP C710656 07A YASKAWA Power Regenerative Converter - D1000 Instruction Manual
Description
and U3-
monitor data is not reset when the
and U3-
monitor data is reset when the
Values
Default: 0
Min.: 0
Max.: 3
Default: 0
Min.: 0
Max.: 1
Default: 0 H
Min.: 0 H
Max.: 9999 H
Default: 0
Min.: 0
Max.: 1
Default: 0 H
Min.: 0 H
Max.: 9999 H
Default: 0%
Min.: 0%
Max.: 150%
Default: 0%
Min.: 0%
Max.: 150%
Default: 0
Min.: 0
Max.: 1
Default: 0
Min.: 0
Max.: 1
Default: 0
Min.: 0
Max.: 1
Default: 000.00
Min.: 000.00
Max.: 650.00

Advertisement

Table of Contents
loading

Table of Contents