CHAPTER 2 PREPARATIONS
2.2 Installation
JDimensions
58
53j
PV
SV
OUT1
OUT2 MANU STOP RMT
AT
RUN
RST
A
M
JPanel cutout
Unit (mm)
60 min.
2–4
13
SUB1
E5CK
65 min.
+0.6
45
0
45
100
• Recommended panel thickness is 1 to 5
mm.
• Maintain the specified vertical and hori
zontal mounting space between each con
+0.6
troller.
0
Controllers must not be closely mounted
vertically or horizontally.
j