Electrical Installation; Cables General; Details Of Terminal Tightening Torques.; Fuses - Danfoss vlt FC 102 Operating Instructions Manual

Hvac drive
Hide thumbs Also See for vlt FC 102:
Table of Contents

Advertisement

®
VLT
HVAC Drive Operating Instructions

4. Electrical installation

4.1. How to connect

4.1.1. Cables General

NB!
For the VLT High Power series mains and motor connections, please see VLT HVAC Drive High Power Operating Instructions, MG.
11.F1.02.
NB!
Cables General
Always comply with national and local regulations on cable cross-sections.

Details of terminal tightening torques.

Enclo-
200-240
sure
V
A2
1.1 - 3.0
A3
3.7
A5
1.1 - 3.7
B1
5.5 - 11
-
B2
15
B3
5.5 - 11
B4
11 - 18.5
C1
18.5 - 30
C2
37 - 45
C3
18.5 - 30
C4
30 - 45
D1/D3
-
D2/D4
-
E1/E2
-
Table 4.1: Tightening of terminals
1) For different cable dimensions x/y, where x ≤ 95 mm² and y ≥ 95 mm²
2) Cable dimensions above 18.5 kW ≥ 35 mm

4.1.2. Fuses

Branch circuit protection
In order to protect the installation against electrical and fire hazard, all branch circuits in an installation, switch gear, machines etc., must be shortcircuit
and overcurrent protected according to the national/international regulations.
Short circuit protection
The frequency converter must be protected against short-circuit to avoid electrical or fire hazard. Danfoss recommends using the fuses mentioned in
tables 4.3 and 4.4 to protect service personnel or other equipment in case of an internal failure in the unit. The frequency converter provides full short
circuit protection in case of a short-circuit on the motor output.
Power (kW)
380-480
525-600
Line
V
V
1.1 - 4.0
1.1 - 4.0
1.8
5.5 - 7.5
5.5 - 7.5
1.8
1.1 - 7.5
1.1 - 7.5
1.8
11 - 18.5
-
1.8
22
-
4.5
30
-
4.5
11 - 18.5
11 - 18.5
1.8
18.5 - 37
18.5 - 37
4.5
37 - 55
-
10
-
75 - 90
14/24
-
37 - 55
37 - 55
10
55 - 90
55 - 90
14/24
110 - 132
110 - 132
19
160-250
160-315
19
315-450
355-560
19
2
and below 22 kW ≤ 10 mm
MG.11.A6.02 - VLT
®
is a registered Danfoss trademark
Torque (Nm)
DC connec-
Motor
tion
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.5
4.5
3.7
2)
4.5
2)
3.7
1.8
1.8
4.5
4.5
10
10
1)
14/24
1)
14
10
10
1)
14/24
1)
14
19
9.6
19
9.6
19
19
2
4. Electrical installation
Brake
Earth
Relay
1.8
3
0.6
1.8
3
0.6
1.8
3
0.6
1.5
3
0.6
3.7
3
0.6
3.7
3
0.6
1.8
3
0.6
4.5
3
0.6
10
3
0.6
14
3
0.6
10
3
0.6
14
3
0.6
9.6
19
0.6
9.6
19
0.6
9.6
19
0.6
4
19

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the vlt FC 102 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF