Mitsubishi Electric QJ71E71-100 User Manual page 360

Q corresponding ethernet interface module
Table of Contents

Advertisement

(2) Reinitialization processing program
Perform the reinitialization process using a program. The following shows the process timing and sample
programs.
(a) Process timing
Close process
Program
Initial normal completion
signal (X19)
Open completion signal
(address: 5000
)
H
UINI instruction
Completion device
Completion device + 1
Reinitialization specification
(address: 1F
(b15))
H
Internal process of the E71
Check the normal completion of the initial process. (Initial normal completion signal (X19): ON)
1
Terminate all data communications with the connected devices and perform a close process on all
2
connections.
Execute the UINI instruction. Specify the parameters (such as the IP address of the own station and Ethernet
3
operation setting) using the control data of the dedicated instruction and initialize the E71.
When the E71 reinitialization request is completed, Initial normal completion signal (X19) turns off.
4
When the reinitialization processes are all completed, Reinitialization specification (address: 1F
5
"0" and Initial normal completion signal (X19) turns on. If the reinitialization process fails, an error code is
stored in the initial error code storage area.
(b) Sample program
The following two methods are available:
• Using the dedicated instruction (UINI instruction)
• Writing directly to the buffer memory
Do not use the method using the dedicated instruction (UINI instruction) and the method by writing directly to the buffer
memory together.
358
END
Scan
Scan
process
1
2
3
4
Requesting
reinitialization
END
END
Scan
process
process
Abnormally ended
Processing reinitialization
Initializing the module
END
Scan
Scan
process
5
(b15) turns
H