Cable Routing And Electrical Parts Installation Instructions (Tc); Position Of The Coil / Stick-Coil; Fuel Injection Control Unit Position (Tc); Position Of The Voltage Regulator (Tc) - Husqvarna 2013 TC 250R Workshop Manual

Husqvarna motorcycles 2013 te 250r; 2013 te 310r; 2013 te 310r usa; 2013 tc 250r; 2013 tc 250r usa; 2013 txc 250r usa; 2013 txc 310r usa
Table of Contents

Advertisement

TE 250R - 310R 2013 I.E. / TE 310R 2013 I.E. USA
TC 250R 2013 - TC 250R 2013 I.E. USA
TXC 250R - 310R 2013 I.E. USA
1
2
3
2
3
ELECTRICAL SYSTEM

Cable routing and electrical parts installation instructions (TC)

• Position of the coil / stick-coil

Connect the coil / stick-coil (1) as the figure shows.
H10135
• Fuel injection control unit position (2) (TC)
Electronic control unit installed with the flat side up.
H11428
• Position of the voltage regulator (3) (TC)
Positioned on the RH under the tank.
H10136

• Position of the connectors front side

On the front side, under the fairing, the following connectors are to be found:
1) Mapping connector
2) Diagnostic connector
1
3) Connector not in use
H10137
M.41
Workshop Manual Ed. 07-2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents