12 July '86
REPLACEMENT AND ADJUSTMENT
1. Distribution Unit Removal
1.
Turn off the copier main switch and undock the sorter from the
copier.
2.
Remove the bin number bracket [A] (2 screws and 2 ground screws) and
the distribution unit support bracket [B] (7 screws).
3.
Remove all the bins [C].
4.
Remove the rear cover [D] (4 screws) and the top cover
screws).
5.
Release the belt tensioner [F] and remove the following parts:
a) Link bracket [G] (4 screws)
b) Bearings [H]
c) Timing belt 166XL
6.
Disconnect the three connectors [J] from the upper distribution
NOTE: When disconnecting, apply pressure to the connectors, not the wires.
[I]
6-8
[E] (5
unit.