NEC NEAX 2000 IPS Installation Manual page 99

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

A
• For Fixed Equipment
Installation of Module
(1) Fix the BASE PLATE to the floor with anchor bolts.
(2) Fix the BASE to the BASE PLATE with screws. See
(3) Fix the Module onto the BASE with screws. See
• For Stationary Equipment
(1) Fix the BASE TRAY to the floor with anchor bolts.
(2) Fix the Module onto the BASE with screws. See
(3) Place the Module and the BASE on the BASE TRAY. See
• Connect Modules with screws. See
Installation of
Multiple-Module
• Install the I/F BRACKET to the top-stack PIMs if the equipment is stacked with
five or more Modules. See
• Install the TOP COVER to the top-stack PIM. See
Installation of
Top Cover
ER".
• Install the MOUNTING BRACKET to the top-stack PIM if the equipment is
Installation of
Mounting Bracket
stacked with four or more Modules. See
BRACKET".
• Carefully review every step above to check that all necessary screws have been
Checking
properly placed and tightened.
End
and BASE
PLATE".
and
BASE".
Page 92
Page 92
and
BASE".
on BASE
TRAY".
Page 94
Page 98
Page 99
– 83 –
CHAPTER 2 INSTALLATION
INSTALLATION OF MAIN EQUIPMENT
Page 91
Page 93
"Connection of
"Installation of I/F
BRACKET".
"Installation of MOUNTING
"Connection of BASE
"Connection of Module
"Connection of Module
"Placing Module
Modules".
Page 97
"Installation of TOP COV-
NWA-008841-001 Rev.5.0
90ch2001.fm