NEC NEAX 2000 IPS Installation Manual page 478

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

NOTE 3:
Set SW-1 and SW-2 as follows:
CONDITIONS
SW
When one PRT is
ON OFF
provided.
When more than
one PRT is
ON OFF OFF ON OFF OFF
provided.
NOTE 4:
Mount the PRT card which receives a source clock signal into PIM0.
NOTE 5:
When using the AP Number 64 to 93 (for AP Number extension) in accommodating the PRT
card on Remote site, be sure to set the SENSE switch and SW1-4 switch of all the PRT cards to
be accommodated to AP Number 31. Also, set AP Number to any one between 64 and 93 by
CM05 for each PRT card. If a different site is used to accommodate the PRT card, be sure to
set switches similarly.
[Series 3800 software or later required]
PRT0
PRT1
SW
SW
SW
-1
-2
-1
-2
PRT2
· · · · ·
SW
SW
-1
-2
– 462 –
PRT7
REMARKS
SW
SW
-1
-2
MP card will receive the
clock signal from PRT0 at
its PLO0 input.
MP card will receive the
clock signal from PRT0 at
its PLO0 input, under nor-
mal conditions.
Should a clock failure
OFF OFF
occurs with PRT0, MP
card will automatically
switch to the PLO1 input
which gets clock from
PRT1.
NWA-008841-001 Rev.5.0
PN-30PRTA (PRT)
90ch3003.fm
NOVEMBER/15/2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents