NEC NEAX 2000 IPS Installation Manual page 82

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

Procedure for Unplugging/Plugging Circuit Cards
CIRCUIT CARD
• PN-CP24-A/PN-CP24-B/
PN-CP24-C/PN-CP24-D (MP)
• PZ-PW121 (AC/DC PWR)
• PZ-PW126 (AC/DC PWR)
• PZ-PW122 (DC/DC PWR)
• PZ-PW135 (PWR)
• PZ-M537 (EXPMEM)
• PZ-M623 (M623)
• PZ-M649 (M649)
• PZ-PW650 (RTA)
• PN-CP27-A/PN-CP27-B (MP)
• PN-CP15 (FP)
• PN-AP00-B (AP00/DBM)
• PN-AP00-D (AP00)
• PN-BRTA (BRT)
• PN-2BRTC (BRT)
• PN-2BRTK (BRT)
• PN-4BRTA-A (BRT)
• PN-24CCTA (CCT)
• PN-30CCTA (CCT)
• PN-CFTC/PN-CFTC-A (CFT)
• PN-DAIA-A (DAIA)
• PN-DAIB (DAIB)
• PN-DAIC (DAIC)
• PN-DAID-A (DAID)
• PN-DAIE (DAIE)
• PN-DAIF (DAIF)
• PN-24DTA-C (DTI)
• PN-30DTC-C (DTI)
• PN-8IPLA (IP-PAD)
• PN-8IPTA (SIP)
• PN-32IPLA/
PN-32IPLA-A (IP-PAD)
• PN-IPTB (IPT)
• PN-24PRTA (PRT)
• PN-30PRTA (PRT)
PROCEDURE
PLUG
UNPLUG
(1) Power off
(1) Power off
(2) Plug in
(2) Unplug
(3) Power on
(3) Power on
(1) Power off
(1) Power off
or MB
or MB
switch on
switch on
(2) Plug in
(2) Unplug
(3) Power on
(3) Power on
or MB
switch off
– 66 –
CHAPTER 2 INSTALLATION
CONDITION
These circuit cards must be
plugged in or unplugged only with
power off to prevent damage to the
card or other system circuitry.
These circuit cards must be
plugged in or unplugged under
Make Busy condition or power off
to prevent damage to the card or
other system circuitry.
Continued on next page
NWA-008841-001 Rev.5.0
PRECAUTIONS
90ch2001.fm
JULY/1/2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents