NEC NEAX 2000 IPS Installation Manual page 128

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

• Connection of AC CORD-B
(1) Connect the AC CORD-B to the CN1 connector on the PZ-PW121/PZ-PW126 card.
(2) Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM.
PZ-PW121/PZ-PW126
AC CORD-B
Connection of AC CORD-B
CN1
FRONT
– 112 –
TO 120 V/240 V AC POWER SOURCE
AC CORD-D
CORD BUSH
TERMINAL BLOCKS
CHAPTER 2 INSTALLATION
POWER CABLE CONNECTION
BASE
NWA-008841-001 Rev.5.0
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents