NEC NEAX 2000 IPS Installation Manual page 108

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

• Connection of Module and BASE for Fixed/Stationary Equipment
(1) Mount the Module on the BASE by placing it over the hooks.
(2) Slide the Module into the inner end.
NOTE:
Pay attention to do not put the Module on Edging of the cable hole on BASE.
(3) Secure the Module to the BASE with three screws.
NOTE:
Screws are attached to the Module.
SCREWS
SLIDE MODULE INTO
INNER END.
Connection of Module and BASE
– 92 –
CHAPTER 2 INSTALLATION
INSTALLATION OF MAIN EQUIPMENT
BASE
HOOKS
MODULE
BASE
NWA-008841-001 Rev.5.0
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents