NEC NEAX 2000 IPS Installation Manual page 34

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

EQUIPMENT
FUNCTIONAL
NAME
COVER
COVER PARTS
PARTS
ASSEM
ASSEM-A
SN1545
BASE/TOP
BASERE
ASSEM
TOP COVER
ASSEM
SN1685
BASE
BASEUC
SN1619
BATTM
BATTMB
SN1671
BATTM
BATTMG
[For EU]
Module Name and Function
NAME
Cover Parts Assembly
One cover parts assembly is required for each PIM.
Base/Top Cover Assembly
One base and top cover assembly is required for each stack.
Base for DC–48 V Power Input System
Installation Cable to Terminal Blocks from this Base is to be local
provided.
Battery Module for housing PIM or CS (ZT) backup batteries
Houses two pairs of batteries for protection from long power inter-
ruption (for 3 hours).
Battery Module for housing PIM backup batteries
Houses two pairs of batteries for protection from long power inter-
ruption (for 3 hours).
CHAPTER 1 GENERAL INFORMATION
FUNCTION
– 18 –
EQUIPMENT NAME AND FUNCTION
NWA-008841-001 Rev.5.0
NOVEMBER/15/2006
90ch1001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents