NEC NEAX 2000 IPS Installation Manual page 29

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

CHAPTER 1 GENERAL INFORMATION
SYSTEM CONFIGURATIONS
2-PIM Configuration for Floor Standing Installation
223 (8.8)
430 (16.9)
PIM
769 (30.2)
NOTE
PIM/BATTM
BASE
FRONT
UNIT : mm (inch)
NOTE:
Height (65 mm (2.6)) of the BASE is included.
– 13 –
NWA-008841-001 Rev.5.0
90ch1001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents