NEC NEAX 2000 IPS Installation Manual page 135

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

• Connection of AC CORD-B
(1)
Connect the AC CORD-B to the DC INPUT connector on the PZ-PW135 card.
(2)
Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM.
PZ-PW135
DC INPUT
AC CORD-B
Connection of AC CORD-B
TO –48 V DC POWER SOURCE
INSTALLATION CABLE
CORD BUSH
FRONT
– 119 –
CHAPTER 2 INSTALLATION
POWER CABLE CONNECTION
BASE
(SN1685
BASEUC)
TERMINAL BLOCKS
NWA-008841-001 Rev.5.0
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents