NEC NEAX 2000 IPS Installation Manual page 115

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

• Installation of MOUNTING BRACKET
Install the MOUNTING BRACKET to the top-stack PIM if the equipment is stacked with four or
more Modules.
(1) Remove four screws located on the rear side of the top-stack PIM.
(2) Secure the MOUNTING BRACKET to the PIM with the removed screws.
(3) Secure the PIM to the wall or ceiling by using wires, chains and eyebolts (locally provided).
Installation of MOUNTING BRACKET
SCREWS
INSTALLATION OF MAIN EQUIPMENT
MOUNTING BRACKET
47 (1.8)
– 99 –
CHAPTER 2 INSTALLATION
FRONT
PIM
UNIT : mm (inch)
NWA-008841-001 Rev.5.0
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents