NEC NEAX 2000 IPS Installation Manual page 534

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

LAMP
COLOR
NAME
BSY32
Red
BSY31
Red
BSY30
Red
BSY22
Red
BSY21
Red
BSY20
Red
B channel status
ON
: B2 channel of the No. 3 circuit is in use.
OFF
: B2 channel of the No. 3 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 3 circuit.
B channel status
ON
: B1 channel of the No. 3 circuit is in use.
OFF
: B1 channel of the No. 3 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 3 circuit.
B channel status
ON
: B0 channel of the No. 3 circuit is in use.
OFF
: B0 channel of the No. 3 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 3 circuit.
B channel status
ON
: B2 channel of the No. 2 circuit is in use.
OFF
: B2 channel of the No. 2 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 2 circuit.
B channel status
ON
: B1 channel of the No. 2 circuit is in use.
OFF
: B1 channel of the No. 2 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 2 circuit.
B channel status
ON
: B0 channel of the No. 2 circuit is in use.
OFF
: B0 channel of the No. 2 circuit is in idle.
Flash (60 IPM)
: ZT is not connected to the No. 2 circuit.
– 518 –
FUNCTION
ZT is in make-busy status.
ZT is in make-busy status.
ZT is in make-busy status.
ZT is in make-busy status.
ZT is in make-busy status.
ZT is in make-busy status.
PN-4CSIA-A (CSI)
Continued on next page
NWA-008841-001 Rev.5.0
90ch3004.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents