Processors
8.3

Replacing the processor heat sink

Field Replaceable Unit
(FRU)
Tools: Phillips PH2 / (+) No. 2 screw driver
8.3.1

Preliminary steps

Before replacing the processor heat sink, perform the following steps:
Ê Shut down the server and disconnect the AC power cord from the system as
described in section
8.3.2
Preliminary steps
Before upgrading or replacing the processor, perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 75
Ê
"Shutting down the server node" on page 41
Ê
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the air duct" on page 44
Ê
"Removing the air duct brackets" on page 43
Ê
180
"Shutting down the server node" on page
Upgrade and Maintenance Manual
Hardware: 15 minutes