Riser Card; Replacing The Riser Card; Preliminary Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

6.5

Riser card

V
CAUTION!
Follow the safety instructions in chapter
page
29.
6.5.1

Replacing the riser card

Upgrade and Repair Unit
(URU)
Tools: Phillips PH2 / (+) No. 2 screw driver
6.5.1.1

Preliminary steps

Perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 75
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 41
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the riser module" on page 68
Ê
"Removing expansion cards" on page 117
Ê
"Removing SAS RAID controller" on page 130
Ê
CX272 S1
Upgrade and Maintenance Manual
Expansion cards
"Important information" on
Hardware: 5 minutes
Software: 5 minutes
(if applicable)
(if applicable)
137

Advertisement

Table of Contents
loading

Table of Contents