Concluding Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

7.4.4

Concluding steps

Perform the following steps:
"Installing the memory slot air ducts" on page 45
Ê
"Installing the air duct brackets" on page 47
Ê
"Installing the air duct" on page 49
Ê
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 73
Ê
"Updating or recovering the system board BIOS and BMC" on page 77
Ê
applicable)
"Enabling boot watchdog functionality" on page 84
Ê
"Verifying the memory mode" on page 85
Ê
CX272 S1
Upgrade and Maintenance Manual
(if applicable)
Main memory
(if
155

Advertisement

Table of Contents
loading

Table of Contents