Installing Sas Raid Controller; Preliminary Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

Expansion cards
6.4.1

Installing SAS RAID controller

Upgrade and Repair Unit
(URU)
Tools: Phillips PH2 / (+) No. 2 screw driver
6.4.1.1

Preliminary steps

Perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 75
Ê
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 41
Ê
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the riser module" on page 68
Ê
124
Upgrade and Maintenance Manual
Hardware: 10 minutes
Software: 5 minutes
CX272 S1

Advertisement

Table of Contents
loading

Table of Contents