Replacing The Processor Heat Sink; Required Tools; Preliminary Steps - Fujitsu Primergy CX270 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for Primergy CX270 S2:
Table of Contents

Advertisement

Processors
8.3

Replacing the processor heat sink

Field Replaceable Units (FRU)
Average task duration: 15 minutes
8.3.1

Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Replacing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
8.3.2

Preliminary steps

Before replacing the processor heat sink, perform the following steps:
Ê Shut down the server and disconnect the AC power cord from the system as
described in section
8.3.3
Preliminary steps
Before upgrading or replacing the processor, perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
"Shutting down the server node" on page 43
Ê
"Removing the server node from the server enclosure" on page 44
Ê
"Removing the cables" on page 45
Ê
"Removing a TESLA GPGPU card" on page 140
Ê
"Removing the air duct" on page 46
Ê
"Removing the GPGPU riser module" on page 48
Ê
"Removing the air duct brackets" on page 49
Ê
260
"Shutting down the server node" on page
Upgrade and Maintenance Manual
43.
(if applicable)
CX270 S2

Advertisement

Table of Contents
loading

Table of Contents