Completing System Board - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

System board and components
Figure 134: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
9.3.2.4

Completing system board

"Installing the UFM board" on page 189
Ê
"Installing the processor heat sink" on page 173
Ê
"Installing a memory module" on page 149
Ê
I
Install the memory modules into their original slots.
Ê Reconnect all cables to the system board. For a complete cabling overview,
please refer to section
218
"Cabling overview" on page
Upgrade and Maintenance Manual
(if applicable)
221.
CX272 S1

Advertisement

Table of Contents
loading

Table of Contents