4.17
Switching on the server node
V
CAUTION!
Follow the safety instructions in chapter
●
page
29.
Ê If applicable, connect all external cables to the server node.
Figure 36: Controls and indicators of the server node
1 ID indicator
Ê Press the On/Off button either on the rear or on the corresponding front
panel to start up the server node.
The power-on indicator is lit green.
I
For further information, refer to
page
228.
CX272 S1
Upgrade and Maintenance Manual
Basic hardware procedures
"Important information" on
2 On/Off button / Power-on indicator
section"Connector panel" on
73