Installing An Acx1000 Or Acx1100 Transceiver; Figure 29: Removing Transceivers - Juniper ACX1000 Hardware Manual

Universal access router
Hide thumbs Also See for ACX1000:
Table of Contents

Advertisement

ACX1000 and ACX1100 Universal Access Router Hardware Guide

Installing an ACX1000 or ACX1100 Transceiver

72

Figure 29: Removing Transceivers

Place a rubber safety cap over the transceiver.
8.
Place the removed transceiver on an antistatic mat or in an electrostatic bag.
9.
CAUTION:
After removing a transceiver from the chassis, wait at least 30
seconds before reinserting it or inserting a transceiver into a different slot.
To install a transceiver:
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Take each transceiver to be installed out of its electrostatic bag, and identify the slot
2.
on the component where it will be installed.
Verify that each transceiver is covered by a rubber safety cap. If it is not, cover the
3.
transceiver with a safety cap.
Carefully align the transceiver with the slots in the component. The connectors should
4.
face the component.
Slide the transceiver until the connector is seated in the component slot. If you are
5.
unable to fully insert the transceiver, make sure the connector is facing the right way.
Close the ejector handle of the transceiver.
6.
Remove the rubber safety cap from the transceiver and the end of the cable. Insert
7.
the cable into the transceiver.
Copyright © 2013, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acx1100

Table of Contents