Installing An Acx1000 Or Acx1100 Transceiver - Juniper ACX1000 Hardware Manual

Universal metro router
Hide thumbs Also See for ACX1000:
Table of Contents

Advertisement

A green status LED indicates that the port is functioning normally.
• From the CLI, issue the show chassis fpc pic-status command.
user@host> show chassis fpc pic-status
Slot 0
Online
PIC 0 Online
PIC 1 Online
PIC 2 Online
SEE ALSO
ACX1000 and ACX1100 Routers Hardware and CLI Terminology Mapping | 5

Installing an ACX1000 or ACX1100 Transceiver

To install a transceiver:
1. Attach an ESD grounding strap to your bare wrist, and connect the other end of the strap to an ESD
grounding point.
2. Take each transceiver to be installed out of its electrostatic bag, and identify the slot on the
component where it will be installed.
3. Verify that each transceiver is covered by a rubber safety cap. If it is not, cover the transceiver with a
safety cap.
4. Carefully align the transceiver with the slots in the component. The connectors should face the
component.
5. Slide the transceiver until the connector is seated in the component slot. If you are unable to fully
insert the transceiver, make sure the connector is facing the right way.
6. Close the ejector handle of the transceiver.
7. Remove the rubber safety cap from the transceiver and the end of the cable. Insert the cable into the
transceiver.
LASER WARNING: Do not look directly into a fiber-optic transceiver or into the ends
of fiber-optic cables. Fiber-optic transceivers and fiber-optic cables connected to a
transceiver emit laser light that can damage your eyes.
8x CHE1T1, RJ48
8x 1GE(LAN) RJ45
4x 1GE(LAN) SFP, RJ45
121

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acx1100

Table of Contents