Novell SENTINEL RAPID DEPLOYMENT 6.1 - 12-2009 User Manual page 28

Table of Contents

Advertisement

Figure 1-3
To add a report:
1 Click the Reports button on the left side of the screen.
2 Click the Upload Report button.
3 Browse and select the report plug-in .
4 Click Open.
5 Click Save.
6 If the same report already exists in the report repository (based on the report's unique ID),
decide whether to replace the existing report.
Sentinel Rapid Deployment displays the details of both the report in the system and the one
being imported. In the example below, the imported report is the same version as the existing
report.
28
Sentinel 6.1 Rapid Deployment User Guide
No Reports Loaded
file on your local machine.
zip

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentinel rapid deployment 6.1

Table of Contents