Novell SENTINEL RAPID DEPLOYMENT 6.1 - 12-2009 User Manual page 22

Table of Contents

Advertisement

IMPORTANT: If a report in progress is canceled by using the Cancel link, the query on the
database is canceled.
Manually Running a Report
1 Click Reports to display the available reports.
2 If desired, click a report definition to expand it. If you see a Sample Report link, you can click
View to find out how the completed report looks with a set of sample data.
3 Select the report you want to run and click Run.
4 Specify the following:
The report parameters are specific to the report definition. Therefore, the report parameters
might vary based on the report definition you select.
22
Sentinel 6.1 Rapid Deployment User Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentinel rapid deployment 6.1

Table of Contents