Toshiba BV410T-GS02-QM-S Owner's Manual page 55

Table of Contents

Advertisement

2.Printer Setup
5
Insert the ribbon spoolers into the ribbon cores.
 Insert the ribbon spoolers into both supply side roll core and take-up side roll core.
 If the width of the ribbon used is the same as that of the ribbon cores, make sure that the ribbon is centered on
the ribbon spoolers.
Load the ribbon according to the figure below.
6
[ a ]
 [a] Supply side
 [b] Take-up side
Pay attention to the front and back sides of the ribbon.
Mount the supply side roll of the ribbon on the guide.
7
1. Fit the left side [1] of the ribbon spooler inserted into the roll in the guide wheel [2].
2. Fit the right side [3] of the ribbon spooler in the guide hole [4].
[ 2 ]
[ 1 ]
[ b ]
[ 3 ]
[ 4 ]
Loading the ribbon (thermal transfer method) 55

Advertisement

Table of Contents
loading

Table of Contents