Attention:
• Read
"Installation Guidelines" on page 43
work safely.
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
"Power off the server" on page
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
Procedure
Step 1.
Disengage the sever if it has been secured to the rack.
Front
Open the rack release latches, and loosen the captive screws counterclockwise with a Phillips
screwdriver.
Note: Use either flat-head, hex socket, or Phillips driver for the following instruction.
Remove the washer and the M5 screw on both sides.
Step 2.
Determine the lifting method. Two lifting options are available:
and
"Safety inspection checklist" on page 44
58.
Rear
.
Chapter 5
Hardware replacement procedures
to ensure that you
59