4.5.1.5
Further steps
● Commission the standard inverter functions by following the operating instructions. The
● Perform an acceptance test for the safety functions:
Safety Integrated Function Manual, SINAMICS G120 and G120C
Function Manual, 01/2011, FW 4.4, A5E03052391B AB
link to the operating instructions can be found in the section Manuals for your inverter
(Page 229).
– Document your settings in an acceptance report.
– Check whether the safety functions are functioning correctly in your application.
– The instructions for the acceptance test can be found in the section Acceptance test -
Completion of commissioning (Page 164).
Commissioning
4.5 Basic Safety
113