4.9.5
Function test
The following is checked during the function test:
● The hardware is functioning properly.
● The digital inputs of the inverter are assigned correctly to the safety function.
● The PROFIsafe address of the inverter has been set correctly.
● The safety function has been parameterized correctly.
● Routine for the dormant error detection of the switch-off signal paths of the inverter.
Safety Integrated Function Manual, SINAMICS G120 and G120C
Function Manual, 01/2011, FW 4.4, A5E03052391B AB
Note
Perform the acceptance test with the maximum possible velocity and acceleration.
4.9 Acceptance test - Completion of commissioning
Commissioning
169