mm mm mm mm
page
–
page
–
C Preventive maintenance – Preventive maintenance
Preventive maintenance
Preventive maintenance, general
It's very important that preventive maintenance is performed ac-
cording to recommended intervals.
Preventive maintenance should be performed by Kalmar Industries,
or by a service organization authorized by Kalmar Industries.
The warranty is not valid if service intervals are not
followed.
Preventive maintenance shall be performed accord-
ing to the prescribed intervals and extent.
Use spare parts, oils and fluids approved by Kalmar
Industries.
Preventive maintenance, work
instructions
1 For new machine it is very important to check-tighten the
2 For new machine, checking actions shall be performed after 50
3 Service at regular intervals shall be performed according to
Maintenance manual DRF 400–450
https://www.forkliftpdfmanuals.com/
C A U T I O N
wheel nuts during the first work week, until they are securely
tightened. This shall be performed at an interval of 4–5 operat-
ing hours (up to approx. 40–50 operating hours).
hours of operation, see 50h-check page 5.
Note completed 50h check in the service log, see Check and
service log page 4.
service schedule, see Service schedule page 7. The service
schedule shall be followed to ensure the machine's high oper-
ating reliability.
Note completed service in the service log, see Check and serv-
ice log page 4.
3
UDRF01.04GB