Pulse Heat; Set-Up - Pace PRC 2000 Operation & Maintenance Manual

Hide thumbs Also See for PRC 2000:
Table of Contents

Advertisement

PULSE HEAT

Located on the extreme left side of the PRC 2000 system, the PULSE HEAT section features a power
output which provides controlled temperature ramp-up to solder reflow and rapid cool down. This
controlled temperature ramp-up helps reduce the risk of thermal shock damage to components and
substrates in combination with other measures such as preheating with the PACE HotSpot. A variety of
rapid connect/disconnect handpieces allow the operator to perform many different SMD removal/
replacement tasks which may be required for any particular repair process. Refer to the "Capabilities"
portion of this manual for a complete description of
PULSE HEAT functions.

SET-UP

1. Install the Redi-Rak handpiece storage holder
onto the top of the system power source.
Complete installation instructions are included
with the Redi-Rak.
2. Insure that the foot pedal connector plug has
been connected to the FOOT PEDAL
Receptacle located on the rear panel of the
power source.
3. Set the PULSE HEAT Output Control to "0".
Figure 123. Foot Pedal Connection
Figure 124. Pulse Heat Control
97

Advertisement

Table of Contents
loading

Table of Contents