Pace PRC 2000 Operation & Maintenance Manual page 85

Hide thumbs Also See for PRC 2000:
Table of Contents

Advertisement

4. Holding the barrel as shown (at a 45°
angle to the work), rest the tip on a
piece of paper and dispense a small
amount of material. This initial
dispensing will fill the tip with
material.
5. Wipe any material residue from the
end of tip.
6. Hold the barrel as shown over the
work area.
7. Depress the foot pedal to dispense
material. The dispense cycle will
remain on in the CONT Mode until
the foot pedal is released. In the
TIMED Mode, the cycle will continue
for the period of time selected on the
PASTE DISP Timer Control. The
pump will turn on periodically to
maintain reservoir air pressure. The
PASTE DISP LED will illuminate
throughout the dispense cycle and
while the paste pump is running.
8. Place barrel in Dispenser Cubby when dispensing operation is complete.
Condensation may occur in the air hose after extended use. This is a
normal occurrence.
Figure 107. Paste Dispensing
NOTE
85

Advertisement

Table of Contents
loading

Table of Contents