Handpiece Vacuum/Pressure; Procedures - Pace PRC 2000 Operation & Maintenance Manual

Hide thumbs Also See for PRC 2000:
Table of Contents

Advertisement

HANDPIECE VACUUM/PRESSURE

The SX-65A, SX-70 and TP-65 handpieces require the use of the SNAP-VAC (vacuum) Port and the TJ-70
handpiece requires the use of the Controllable PRESSURE Port on the THERMAL MANAGEMENT
CENTER (TMC).
There are two preferred methods for connection of the Air Hose. The advantages of each method are
discussed in the paragraph below. Select the method best suited to your particular application.
1. TRADITIONAL METHOD - Best suited for single air handpiece configurations. Configuration
allows the air hose to be attached to the handpiece power cord. Any TJ-70 Mini ThermoJet
handpiece should be configured using this method.
2. QUICK CONNECT METHOD - Best suited for THERMAL MANAGEMENT CENTER
configurations which include multiple air handpiece attachment. A single Air Hose can be
easily transferred between handpieces using quick connect fittings attached to the rear of each
handpiece.

PROCEDURES:

TRADITIONAL METHOD
1. Connect the 54 inch (137cm) length of Air Hose to the
metal tube in the back of the air handpiece.
2. Insert the ridged end of a male quick connect hose
mount Fitting (P/N 1259-0087) into the free end of the
54 inch (137cm) Air Hose.
3. Secure the Air Hose to the handpiece power cord with
cable clips (P/N 1321-0085-01).
Fitting
Air Hose
Figure 19. Air Hose To Fitting
33

Advertisement

Table of Contents
loading

Table of Contents