Omron PROFINET NX-PNC202 User Manual page 98

Machine automation controller coupler unit
Table of Contents

Advertisement

6 Installation
 Wiring Ducts
Whenever possible, route IO wiring through wiring ducts.
Install mounting bases so that it is easy to wire the IO Units through ducts. It is handy to have the
ducts at the same height as the Profinet IO Device Terminal.
Duct
20 mm min
PROFINET
Slave
Terminal
20 mm min
Duct
 Wiring Duct Example
30 mm
40 mm
*1. The height of the DIN Track is not considered in this figure.
6 - 4
DIN Track
71 mm
PROFINET
Slave
Terminal
30 mm
PROFINET
Slave
Terminal
Duct
*1
Mounting base
NX-series PROFINET Coupler Unit User's Manual (W623)

Advertisement

Table of Contents
loading

Table of Contents