Enhancement device setup procedure > Optional device installation
6
Put pulleys [B] located at front and rear of the folding unit [A] onto inside part [C] of
the rails then push it to the direction of the arrow. The rail gets middle pulley [D].
Install the folding unit {A] to DF-9100 along with the rails.
[B]
[C]
[D]
IMPORTANT
• Do not remove fixing tape [F] on wire guide [E] in instillation. (The tape [F] will be removed in step 20.)
7
Release lock lever [B] and pull out the folding unit {A] from DF-9100 to the left.
[A]
[A]
[B]
3-199
[CONFIDENTIAL]
[B]
[C]
[D]
a
[E]
[F]
[A]