Initialisation Steps In Daily Use; Fv-110Gx Operational - Furuno FV-110GX Operator's Manual

Gx terminal
Table of Contents

Advertisement

Power up
The LEDs Power and Fail/Pass are steady green, the LED Logon is off. For further
information on status indicators see Status signalling with LEDs and status messages
on page 7-15.
Make sure there are no hardware failures or error codes present, check the display of
the ACU for events. For more information on error codes and events see System
messages on page B-1.
3. Make an azimuth and a cable loss calibration, see Calibration on page 5-7.
4. Switch on the GMU.
For more detailed step-by-step instructions, see the chapter Configuration on page 5-1.
4.2.3

Initialisation steps in daily use

Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
• ACU POST
• Antenna Initializing
• Antenna SW upload (If the software versions in the ADU and ACU are not the
same, a software update is done during startup.)
• Antenna POST
• READY
• POINTING ANTENNA
• ACQUIRING SIGNAL
• TRACKING
4.2.4

FV-110GX operational

When the display shows TRACKING. MDM: NETOK and the LED Logon is steady
green the system is operational.
4-2
Figure 4-3: ACU display, system operational

Advertisement

Table of Contents
loading

Table of Contents