Self test

You can start a self test of the FV-110GX ADU and ACU.
1. Click Self test in the SERVICE page.
2. Click the menu item Restart antenna or Restart terminal.
Separate reboot of antenna: Restart antenna
System reboot: Restart terminal
The extended post will have to be manually enabled it in the Self test menu. When
Extended antenna POST is enabled, each axis is tested and calibrated, one by one. The
extended POST will be run after every reboot / power up of the FV-110GX, until it is
disabled again.
Important
7-8
Figure 7-6: Web interface: SERVICE, Line up: Antenna ready
Warning! The FV-110GX will reboot to perform
the self test. Rebooting the ACU will terminate all
existing connections.